Fabricated and installed a three-tier exterior staircase for a residential property in Sandy, Utah, at the mouth of Big Cottonwood Canyon. Used 12″ safety grating treads, 8″ C-channel stringers, and a square-tube railing system. A 22% bidirectional slope required precise shop fabrication and a 45-ton crane for on-site assembly.
Three-Tier Exterior Staircase – Sandy, Utah Hillside Residence
12″ safety grating treads, 8″ C-channel stringers, and powder-coated railings installed on a 22% bidirectional slope.
What the Customer Needed
Homeowner needed a functional exterior staircase to access a hillside portion of the property at the mouth of Big Cottonwood Canyon. The existing terrain made walking or standard stepped solutions unsafe. The goal was a modern, durable stair system that would blend with the property while handling the slope.
Design Decisions
- 12″ safety grating treads – Chosen for slip resistance on a canyon hillside exposed to moisture and debris. Open grating also allows snow and dirt to fall through rather than accumulating.
- 8″ C-channel stringers – Provided the necessary span strength without excessive weight. C-channel also simplified field bolting connections compared to tube or I-beam.
- Horizontal 1″ x 1/2″ pickets – Used instead of vertical pickets to match the modern design of the home while keeping the railing visually lighter. Picket spacing was planned around IRC R312.1.3 opening limitations, which generally restrict required residential guard openings from allowing a 4″ sphere to pass through, with a 4-3/8″ allowance on the open side of stairs. The code basis is IRC R312.1.3 — Opening Limitations. It says required guards cannot have openings that allow a 4″ sphere to pass through, with exceptions for stair-side guards and triangular stair openings.
- Coal Black powder coat – Selected for durability against Utah canyon weather (UV, snow freeze-thaw). Black recedes visually into the hillside and house shadows.
- Three-tier configuration – Broke the total rise into manageable sections to adapt to the bidirectional slope. Each tier has its own footing plane.
It’s one of those jobs where the before photo makes you wonder how it went so long without rails, and the after photo just makes sense.
Fabrication Process
All components were cut, welded, and finished in Titan Forge’s shop. The 22% slope that sloped away from the house in two directions meant standard stringer layout math did not work. We calculated rise and run for each tier independently using field survey data.
Stringers were welded as complete assemblies with tread attachment points pre-drilled. Because the hillside footings could not be precisely located until excavation and field verification were complete, we delayed final hole drilling on the stair sections. That gave us the flexibility to match the actual footing locations on site instead of relying on measurements that could shift once the slope was opened up. The entire stair was then disassembled, powder coated, and staged for crane delivery.
Constraint: Shop fabrication on a bidirectional slope required trusting our measurements. There was no practical way to test-fit on-site before coating without damaging the finish.
Installation Considerations
A 45-ton crane was required because the hillside had no vehicle access or stable ground for a boom lift or manlift. Each stair tier section weighed approximately 1000 lbs. The crane lifted the stair sections from the street to the assembly location on the side of the house.
Cement footings were the hardest part. The bidirectional slope meant each footing hole had to be dug to a different depth and orientation to achieve a level mounting surface for the stringer base plates. We verified footing elevations with the tools available before setting anchor locations. Because the hillside sloped in two directions, the footings were made larger than they would be on a flat-site installation. That extra bearing area gave us more room for final alignment during assembly.
Assembly sequence:
- Footings cured
- Lower tier stringers placed and bolted
- Middle tier positioned using crane
- Upper tier final aligned
- Treads bolted
- Railings installed with field welding
Lessons Learned
- On bidirectional slopes, survey each footing location individually. Do not assume stringer math transfers between tiers.
- Powder coat touch-up kit is mandatory. Crane slings and field assembly always scratch at connection points.
- 12″ x 47″ safety grating treads – Selected for the exterior stair runs to provide a wide walking surface with open drainage. The 12″ depth gave each step a solid foot placement, while the 47″ width helped the stair system feel more residential and less like a narrow utility stair.
- Pre-drilling all tread attachment holes in the shop saved time on-site, but we should have allowed for a slightly greater tollerance – maybe 1/8″ to help with alignment with the 1000lb stairs is hanging overhead from a crane.
FAQ
Why use safety grating instead of solid treads?
Safety grating allows snow, mud, and debris to fall through, reducing slip hazards on a canyon hillside exposed to Utah weather.
Why was a 45-ton crane necessary?
The hillside location had no stable ground for a lift or boom truck. The crane lifted prefabricated stair sections directly from the access point to the footing locations. Using a large crane really made all the difference. The crane operator was amazing at getting the placement nearly perfect.
What is a bidirectional slope?
A slope that drops away in two directions simultaneously. In this Sandy project, the terrain sloped down and away from the house while also sloping across the stair line, making footings difficult to level.
Links
Testimonials: https://utahwelder.com/testimonials/
Related project: Custom Handrails for Utah County