Completed custom black powder-coated metal staircase with horizontal tube handrail and balusters installed in Spanish Fork Utah warehouse by Titan Forge
Modular powder-coated steel staircase being installed through a narrow doorway inside a Spanish Fork Utah warehouse by Titan Forge
Bent steel stair treads overlapping to form consistent steps during fabrication
Jason Pedersen's fabrication of a mid-landing section for a modular metal staircase
Metal staircase handrail and baluster detail using square tubing

How Do You Install a Staircase Through a Standard Doorway?

Titan Forge LLC fabricated a custom modular U-shaped steel staircase for Cascade Rooftop Screens, a commercial manufacturer located just north of the Spanish Fork Airport in Utah County. The staircase connects the warehouse floor to a second-floor office level — a straightforward scope with one constraint that shaped every decision: the entire structure had to be carried through a roughly 48-inch doorway before a single weld was made on site.

How Do You Install a Full-Size Staircase Through a 48-Inch Doorway?

You don’t install it as one piece — you design it from the start so it never has to be. For this project, every section of the staircase was engineered to clear a roughly 48-inch opening, transported through the doorway, positioned in place, and then field-welded into a single rigid structure. The U-shape — two flights turning 180 degrees across a mid-landing — means the assembled footprint is 12 feet wide by nearly 13 feet deep. None of that fits through a standard commercial doorway. So it never tried to.What makes this approach harder than it sounds is the finish. The entire staircase was powder-coated before installation. That means every dimension, every connection point, every hole had to be correct before the sections left the shop. There’s no grinding and repainting a powder-coated weld joint on a second pass without it showing. The margin for error on site was effectively zero.

How Was the Staircase Fabricated?

The structure was fabricated entirely in-house at Titan Forge’s Springville shop over six weeks, with an additional week for powder coating and installation planning.

Stringers

Each flight runs on two stringers — straight 3-1/2″ square tube, 1/4″ wall thickness, running the full diagonal length of the flight. Two stringers per flight, four total across the staircase. These are the primary load-carrying members for each run.

Treads

Each of the 18 treads — 9 per flight — is individually cut from 10 gauge steel sheet and bent into a Z-profile: a 7-inch rise, an 11-inch run, and a short 2-inch lip at the top where the next tread’s rise seats against it. That lip-and-seat geometry is what locks the treads together in sequence. Every tread is fully welded to the stringers and to the adjacent treads — no bolts, no screws, no mechanical fasteners in the tread assembly.

Mid-Landing Platform

The landing between the two flights is approximately 8 feet by 4 feet, supported by six vertical legs in 3-1/2″ square tube, 1/4″ wall thickness. K-bracing runs between the legs on both ends, transferring load to the warehouse floor without relying on the building walls for structural support. Base plates are 1/4″ thick steel, approximately 8 to 9 inches square, anchored at the base of each vertical leg.

Handrail System

Newel posts are 2″ square tube. The top handrail runs in 2″ × 1″ rectangular tube the full length of both flights. Horizontal balusters are 1″ × 1/2″ rectangular tube, spaced for code-conscious clearance throughout.
Everything was powder-coated before the crew went on site.

What Did Installation Look Like?

One day on site. Sections were staged outside, carried through the 48-inch doorway one at a time, set onto their base plates, and field-welded together in sequence — lower flight first, mid-landing platform second, upper flight third. Alignment had to be maintained across the full U-shape as each section was added. A staircase that drifts or twists mid-assembly doesn’t correct itself.
Working around a finished powder-coat surface means every grind mark and every heat-affected zone from a field weld is permanent and visible. The crew worked accordingly.
The result is a staircase that gives no indication of how it got inside the building. It looks like it was built in place — because functionally, it was.

Project Specs

  • Client: Cascade Rooftop Screens, Spanish Fork, UT
  • Application: Commercial warehouse, ground floor to second-floor offices
  • Structure: Modular U-shaped staircase with mid-landing
  • Overall footprint: 144″ wide × 153″ deep (12′ × 12’9″)
  • Total rise: Approximately 133″ (11’1″)
  • Stair width: 37″ per flight
  • Treads: 18 total (9 per flight), 10 gauge steel, 7″ rise × 11″ run, Z-bent profile, fully welded
  • Stringers: 3-1/2″ square tube, 1/4″ wall, two per flight
  • Vertical support posts: 3-1/2″ square tube, 1/4″ wall, six legs under mid-landing
  • K-bracing: Both ends of mid-landing support frame
  • Base plates: 1/4″ thick, approximately 8″–9″ square
  • Newel posts: 2″ square tube
  • Handrail: 2″ × 1″ rectangular tube
  • Balusters: 1″ × 1/2″ rectangular tube
  • Finish: Powder coat, applied pre-installation
  • Access constraint: ~48″ doorway opening
  • Fabrication timeline: 6 weeks in-shop, 1 week coating and installation
  • Location: Titan Forge LLC, Springville, UT

FAQ

Can Titan Forge build a staircase for a tight-access commercial space?

Yes — and the access constraint has to be designed in from day one, not solved on site. Modular construction with field-welded connections is the right approach when the assembled structure won’t fit through the available opening.

Do you powder coat before or after installation?

On this project, powder coat was applied before installation. That’s the harder path — every dimension has to be correct in the shop — but it produces a cleaner finished result than coating in place or touching up field welds after the fact.

What steel is used for a commercial staircase?

Primary structure on this project used 3-1/2″ square tube at 1/4″ wall thickness for stringers and vertical support posts. Treads are 10 gauge steel sheet, Z-bent to create the rise and run geometry. Handrail components are lighter section — 2″ × 1″ rectangular tube for the rail, 1″ × 1/2″ for balusters.

How long does a project like this take?

This staircase took six weeks to fabricate and one week for coating and installation. Timeline depends on complexity, access constraints, and finish requirements.

Does Titan Forge work with commercial clients in Utah County?

Yes. Commercial fabrication — stairs, structural steel, site furnishings, custom metalwork — is a core part of what we do. If you have drawings or a scope, send them over.

Send me your drawings or describe your access constraints and I’ll tell you exactly what’s involved.